Sign In | Join Free | My himfr.com
Home > Mechanized Bridge >

Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load

CHINA HARZONE INDUSTRY CORP.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers
     
    Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers
    • Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers
    • Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers
    • Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers
    • Buy cheap Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load from wholesalers

    Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load

    Ask Lasest Price
    Brand Name : Harzone
    Delivery Time : negotiation
    Payment Terms : According to detailed order
    • Product Details
    • Company Profile

    Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load


    Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 60t / 17t Load


    Heavy Mountain Bridge is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle. It is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.

    Specifications for Heavy Mountain Bridge

    Tracked load / axle load

    55t / 17t

    Outline dimension (L*W*H)

    13*3.3*3.6m

    Gross weight

    32.5t

    Bridge weight

    10.5t

    Bridge length

    21m

    Negotiating length (on hard banks)

    19m

    Section length

    10.63m

    Bridge width (when expanding)

    3.3m

    Track width

    1.15m

    Section height

    0.95m

    End section height

    0.35m

    Operator

    2-3

    Erection time

    10 min

    Max. longitudinal slope / lateral slope

    ±10% / ±5%

    Allowable bank height difference

    5%


    Product Tags:

    military Bridge

      

    Wheel Bridge

      
    Quality Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 55t / 17t Load for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: CHINA HARZONE INDUSTRY CORP.,LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)